Catalogue Intelligent Entertainment 2025-2026 150 - Flipbook - Page 90
Your Liabilities
Before our team arrives, your venue must meet certain essential
requirements to ensure smooth and timely installation.
Floor Plans & Dimensions
Here are the key responsibilities
you’ll need to ful昀椀ll:
•
•
•
Accurate architectural 昀氀oor plan (DWG or clean PDF).
Final post-construction dimensions (openings, ceilings).
Marking of all 昀椀xed objects and removable walls.
Venue Construction
Venue Readiness
•
•
•
•
•
•
•
•
Interior wall installation.
Entrance & exit door placement.
Reception and common area prep.
Masking paper on escape room 昀氀oors.
Construction lamps and ladders (per room).
Air compressor (50L, 2.5HP).
Dumpster for material disposal.
Rooms must be completely cleared for setup.
Electrical Preparation
•
•
•
•
Per-room network and power cables (per specs).
Dedicated HUB panel space.
Network switches and Wi-Fi coverage.
Game Master desk(s) with power access.
Note:
A detailed list of technical and preparation requirements
is available in the full Client Liabilities Guide.
90
Shipping Management
•
•
•
Coordinate delivery access for 18m truck.
Handle local unloading permissions & staff.
Ensure 2 pallet jacks and (optional) forklift are on-site.
Scan the QR code
to read our complete
Client Liabilities guide.